DealEconomix for Creatio enables users to generate or upload project quotes based on resource allocation, auto-calculate total cost, compare against budget, and instantly view projected margin and profitability in real time.

Overview

Product overview

Product description

DealEconomix is a Creatio-based Proposal & Deal Economics Management application that enables organizations to accurately estimate project costs, validate financials, and control deal approvals for fixed-bid engagements.
It replaces spreadsheet-driven costing with a centralized, automated, and governance-driven system, ensuring real-time visibility into cost, budget, and profitability before a deal is finalized.

Product User case -

DealEconomix streamlines the end-to-end proposal lifecycle:

  1. Create Proposal

    • Define project details such as duration, budget, and currency

    • Establish a structured proposal header

  2. Add Resource Allocations

    • Include manpower, platforms, licenses, and overheads

    • Configure cost rates, allocation %, and duration

  3. Automated Calculations

    • System calculates:

      • Net working days

      • Line-level cost

      • Total project cost

      • Margin & variance

    • All values update instantly on data changes

  4. Multi-Currency Handling

    • Convert all costs into a base currency automatically

    • Ensure accurate global financial calculations

  5. Approval Workflow

    • Route proposals through multi-level approvals

    • Enforce role-based access and record locking

  6. Final Decision & Integration

    • Approved proposals can be exported or integrated with CRM/ERP systems

    • Enable seamless transition to project execution

Key Features

Structured proposal creation

Define proposal headers and key project details, including duration, budget, and currency, then generate or upload project quotes in a single Creatio workspace. Standardized setup reduces errors for fixed bid engagements.

Resource allocation management

Configure manpower, platforms, licenses, and overheads with flexible cost rates, allocation percentages, and duration. Build precise line items that roll up into accurate project quotes based on planned resource usage.

Automated Cost & Margin Calculation

Let the system auto compute net working days, line level costs, and total project cost, updating instantly as data changes. Built in automation removes spreadsheets and ensures consistent costing across every proposal.

Multi currency cost handling

Convert all proposal and resource costs into a defined base currency automatically to support global deals. Consistent conversions enable accurate comparisons, budgeting, and profitability analysis across geographies.

Controlled approval workflow

Route proposals through multi level approvals with role based access and record locking. Governance controls protect data integrity and ensure only authorized users can advance or approve deal economics.

Categories

Industries

UI Framework

UI Framework
Freedom UI

Type

Type
Application

Price

Price
Paid
Trial

Compatible with Creatio

Version
8.3.2 and up

Release information

Launched:
Updated:

Pricing

Monthly
Annual
Standard
$ 5.00 user / month
billed annually
From 5 users
Description (Formatted)
Includes full access to DealEconomix for fixed-bid proposal creation, resource-based costing, automated margin calculation, multi-currency support, and governance-driven approval workflows with real-time financial visibility.

Terms and Conditions

By installing this product you agree to terms and conditions outlined in the license agreement.

Support

Support is available for this application
Support is provided by the developer within the “Basic” and “Business” packages. Detailed information about the support packages and the support terms can be found on the Creatio website.

Installation

Setup guide

  • Configure resource types and cost rate structures

  • Set base currency and exchange rates

  • Define working days and holidays

  • Assign user roles and permissions

  • Set up multi-level approval workflow

  • Create and validate your first proposal

  • Configure integrations (optional)

Detailed step-by-step instructions are available in the User Guide.

Compatibility notes

Compatibility notes

 

Product compatibility

UI Framework

Freedom UI

Deployment Options

Cloud
On-site

DBMS

Any supported DBMS

Platform

.NET Framework

Compatible with Creatio

8.3.2 and up

Versions

Versions history

Version
Compatibility
Release date
1.0.0
8.3.2 and up
June 03, 2026
Release summary
  • Initial release of DealEconomix for fixed-bid proposal management

  • Resource-based costing with automated margin calculation

  • Multi-currency support with real-time conversion

  • Net working day calculation (excluding weekends & holidays)

  • Multi-level approval workflow with role-based access

  • Real-time financial visibility (cost, variance, margin)

Manual app installation

  1. Open the needed app → the Packages tab - download the Markeplace app files.
  2. Click in the top right → Application Hub
  3. Click New application. This opens a window.
  4. Select Install from file and click Select in the window that opens.
  5. Click Select file on the page of the Marketplace App Installation Wizard and specify the app file path.

Reviews